FUJI PROJECTS

Finishes Insights

Industrial painting: why surface preparation comes first

INDUSTRIAL PAINTING & FINISHING · FUJI PROJECTS JOURNAL

Industrial painting: why surface preparation comes first

A coating is only as good as the surface beneath it. Here is how to plan a durable finish.

Industrial painting: why surface preparation comes first

1. Identify the surface and the exposure

Steel, concrete and plaster need different systems, and indoor and outdoor areas face different conditions. Note moisture, chemicals and temperature before choosing a coating.

2. Prepare the surface properly

Cleaning, removing loose material and repairing defects all affect how long a coating lasts. Preparation is usually the largest part of a good paint job.

Representative automotive production facility

3. Choose a coating system, not just a colour

Primer, intermediate and finish coats work together. Follow the manufacturer’s guidance on thickness and drying times.

4. Plan around operations

Painting can create fumes and needs drying time. Agree work areas, ventilation and timing with the facility team.

5. Inspect and keep records

Check surface preparation and coating thickness at agreed points. Records help with future maintenance.

A useful next step

Write down your project’s purpose, what you already know and the questions that still need an answer. Use those notes to guide the first discussion with your project team.

Discuss your project →
← Back to all insights

CONTACT WITH OUR TEAM

Let’s give your ideas
a place to grow.

Start with a conversation about what you want to build.

LET’S START A CONVERSATION

Get in Touch

Tell us where you are in your project and what you want to achieve.

Visit our office

AWFIS Bhutani Technopark, 7th Floor, Noida-Greater Noida Expressway, Sector 127, Noida, Uttar Pradesh 201313